Chaouki Moumeni, Kamel Tadjine, Hamid Hamadache and Mourad Nahal2 (2020) MULTI-CRITERIA DECISION SUPPORT OF PROJECT RISK ASSESSMENT. Suranaree Journal of Science and Technology , 28 (5)(010072), 1-9
Scientific Publications
Important: This page is frozen. New documents are now available in the digital repository DSpace
Abstract
Risk is an inherent property of each project, because a project life cycle is subjected to different nature’s risks, such as internal or external origins. The aim of this paper is to rank the pipeline installation project construction’s risks in order of importance, taken into account the two multi-criteria approaches of decision support which are Analytic Hierarchy Process (AHP) and Weighted Product Model (WPM). The project construction’s risks have been estimated using the cost, delay and quality criteria. The weighted criticality of each risk was determined according to the project characteristics, the probability of occurrence, aggregate impact and the non-detectability factor.
Information
Item Type | Journal |
---|---|
Divisions |
» Laboratory of Research on Electromechanical and Dependability |
ePrint ID | 4772 |
Date Deposited | 2023-12-24 |
Further Information | Google Scholar |
URI | https://univ-soukahras.dz/en/publication/article/4772 |
BibTex
@article{uniusa4772,
title={MULTI-CRITERIA DECISION SUPPORT OF PROJECT RISK ASSESSMENT},
author={Chaouki Moumeni, Kamel Tadjine, Hamid Hamadache and Mourad Nahal2},
journal={Suranaree Journal of Science and Technology}
year={2020},
volume={28 (5)},
number={010072},
pages={1-9},
publisher={}
}
title={MULTI-CRITERIA DECISION SUPPORT OF PROJECT RISK ASSESSMENT},
author={Chaouki Moumeni, Kamel Tadjine, Hamid Hamadache and Mourad Nahal2},
journal={Suranaree Journal of Science and Technology}
year={2020},
volume={28 (5)},
number={010072},
pages={1-9},
publisher={}
}